Comprehensive Assessment of Contractor”s Financial Claims in Repair and Maitenance Projects for Iranian Public Companies” Buildings


در حال بارگذاری
23 اکتبر 2022
فایل ورد و پاورپوینت
2120
3 بازدید
۷۹,۷۰۰ تومان
خرید

توجه : به همراه فایل word این محصول فایل پاورپوینت (PowerPoint) و اسلاید های آن به صورت هدیه ارائه خواهد شد

 Comprehensive Assessment of Contractor”s Financial Claims in Repair and Maitenance Projects for Iranian Public Companies” Buildings دارای ۱۸ صفحه می باشد و دارای تنظیمات در microsoft word می باشد و آماده پرینت یا چاپ است

فایل ورد Comprehensive Assessment of Contractor”s Financial Claims in Repair and Maitenance Projects for Iranian Public Companies” Buildings  کاملا فرمت بندی و تنظیم شده در استاندارد دانشگاه  و مراکز دولتی می باشد.

توجه : در صورت  مشاهده  بهم ریختگی احتمالی در متون زیر ،دلیل ان کپی کردن این مطالب از داخل فایل ورد می باشد و در فایل اصلی Comprehensive Assessment of Contractor”s Financial Claims in Repair and Maitenance Projects for Iranian Public Companies” Buildings،به هیچ وجه بهم ریختگی وجود ندارد


بخشی از متن Comprehensive Assessment of Contractor”s Financial Claims in Repair and Maitenance Projects for Iranian Public Companies” Buildings :

تعداد صفحات :۱۸

چکیده مقاله:

The nature of repair projects entails many potential factors including complexity, dispersion, and emergency which create changes in work. Such changes can alter direct costs for the contractor and influence project time by creating pauses, delays and expeditions in plans and methods of doing the job. Since Iranian public companies, use contractor”s services to repair and maintain buildings, there is a need to have a projects management system by considering required processes for comprehensive assessment of claims with the goal of increasing quality, reducing repair time and appropriate optimization of costs. Repair projects in Iranian public companies were studied. A four-step method of analysis was used. In the first step, the characteristics and conditions of repair projects were investigated. In the second step, frequency measurement method, probability of changing into difference and gradation of claims based on their importance were presented by recognizing factors and root causes which of transforming these factors to differences in order to carry out a qualitative assessment of such projects. In the third step, some tasks such as specifying the cost effect of factors, investigating contract rates and how to change them, identifying methods affected by plan and time, removing delays in the repair plan, recognizing causes and methods, discovering the amount of time saved, using costs differences in the updated plan and contractors” status reports, were carried out as appropriate techniques to analyze the effect of factors. In the fourth step, the expected cost of the project was compared to the real cost and a comparison was made between a time span of the project under normal conditions and another time span of the same project influenced by delay, in order to perform a quantitative assessment of the claims. In the end, the methods which were used in the study are presented as well as the use of price details and contractor”s primary rates, primary schedules, and detailed schedules prepared for the process of carrying out the project are suggested as ways to calculate the altered cost and time .

  راهنمای خرید:
  • در صورتی که به هر دلیلی موفق به دانلود فایل مورد نظر نشدید با ما تماس بگیرید.